تفاصيل العمل

1- Applying load estimation to determine the total load of the building according to NEC (National Electrical Code)

2- Appling Lighting design and calculations for normal and emergency lighting and life safety lighting by using Dialux evo

3- Wiring the luminaires fixtures

4- Design small power plans for Rooms according to the furniture plans

5-determine the best places for critical sockets (UPS) according to my point of view

6-Design HVAC POWER (MEP Coordination)

7- Using an EXCEL sheet for every panel board and achieving phase balance and determine the value of main cable and CB

8- Sizing of all bulk Equipment in the project ( Transformer - generator - UPS - ATS ) and sizing cables according to (ElSWEDY CATALOGUE)

9- Calculation of Voltage drop and Short circuit manually and by using ETAP

10-Design a Detailed SLD

11- Design Earthing System