Structural Design & BIM Engineer with a track record in Technical Office operations and integrated project delivery. I specialize in providing end-to-end digital construction solutions that eliminate site errors and optimize project costs.

What I bring to your project:

• Precise 3D BIM Modeling: Detailed architectural and structural models using Revit.

• Advanced Structural Analysis: Comprehensive FEA and stability verification via Robot Structural Analysis.

• Clash Detection & Coordination: Identifying and resolving interdisciplinary conflicts using Navisworks.

• Project Controls: Expert scheduling (Primavera P6), Quantity Take-off, and Cost Estimation (Excel).

• Data Visualization: Interactive project dashboards using Power BI for real-time tracking.

• High-End Visualization: AI-powered architectural rendering for realistic project previews.

My goal is to deliver "Build it twice" efficiency: building it perfectly in the digital world before a single brick is laid on-site

إحصائيات

التقييمات  (0)
إكمال المشاريع
التسليم بالموعد
إعادة التوظيف
نجاح التواصلات
متوسط سرعة الرد لم يحسب بعد
تاريخ التسجيل
آخر تواجد منذ

توثيقات

البريد الإلكتروني رقم الجوال
الهوية الشخصية