تفاصيل العمل

* Conducted data collection for an office building project in Cairo.

* Gathered and verified the architectural and mechanical information required for HVAC design.

* Collected design parameters, including occupancy, lighting, equipment loads, building orientation, and construction details.

* Prepared the project data required for cooling load calculations.

* Organized and validated the collected information to ensure accurate HVAC system design.

ملفات مرفقة

بطاقة العمل

اسم المستقل
عدد الإعجابات
0
تاريخ الإضافة
تاريخ الإنجاز
المهارات