Managed the planning, scheduling, and control phases for a major infrastructure project consisting of [37] km of Gravity Sewer Lines (UPVC/GRP), [448] Manholes. The scope also included dewatering works, deep excavation, and asphalt reinstatement.
Key Responsibilities & Achievements
Baseline Schedule Development: Created a fully detailed CPM schedule using Primavera P6, breaking down the scope into zones and streets based on approved construction drawings
Resource Loading: Calculated and assigned manpower and equipment resources based on realistic productivity rates for excavation