تفاصيل العمل

Approved the contractor shop drawings.

Design reviewing.

Noting the design mistakes, and contacting the design for resolving.

Re-design some elements of buildings.

Approved the contractor as-built drawings.

Coordinate arch. and MEP drawings with the structural drawings.

Making technical reports.

Solving technical problems at the site.

بطاقة العمل

اسم المستقل أحمد ب.
عدد الإعجابات 0
عدد المشاهدات 402
تاريخ الإضافة