250 tons refrigeration HVAC system design for a four floors administrative building.

The project process was as the following :-

1) load calculations with HAP software based on ASHRAE standards

2) Ducts and registers sizing was made based on ASHRAE standards

3) Chiller piping system and pipe sizes was made based on ASHRAE standards

4) Drawings and all design information are provided by AutoCAD MEP.