Project Brief:

This task involved designing a metal pipe support structure located in Suez City, with a total steel weight of approximately 9187 kg.

Project Summary:

The task focused on modeling a factory building based on a trussed frame system, incorporating various structural components such as:

• Stairs

• Mezzanine floor

• Castellated beams

• Car shed structure

• Crane Bracket & Rail .   

A mix of steel sections was applied — combining both hot-rolled and PEB sections.

Total Steel Weight: 885 tons

* Project Area: 85m × 97m