Project Brief:
This task involved designing a metal pipe support structure located in Suez City, with a total steel weight of approximately 9187 kg.
Project Summary:
The task focused on modeling a factory building based on a trussed frame system, incorporating various structural components such as:
• Stairs
• Mezzanine floor
• Castellated beams
• Car shed structure
• Crane Bracket & Rail .
A mix of steel sections was applied — combining both hot-rolled and PEB sections.
Total Steel Weight: 885 tons
* Project Area: 85m × 97m