The project involved the complete renovation and rehabilitation of an old, severely damaged warehouse. The facility had multiple structural, architectural, electrical, and mechanical issues that required full restoration to bring it back to operational condition.

Key Features of the Work

Structural Rehabilitation:

Repairing damaged walls, columns, beams, and floor slabs; strengthening weak structural elements.

Architectural Renovation:

Complete refurbishment of internal and external areas including plastering, painting, ceiling works, doors, windows, and finishing upgrades.

Electrical & Mechanical Upgrades:

Replacement of old wiring, installation of new lighting systems, DB panels, HVAC units, exhaust fans, and other MEP components.

Plumbing & Drainage Works:

Replacing damaged pipelines, valves, drainage lines, and ensuring proper water supply and waste management.

Flooring & Roofing Improvements:

Installation of new concrete flooring, epoxy coating, tile work, and repairing or replacing the roof structure.

Safety & Compliance Enhancements:

Upgrading fire‑fighting systems, emergency exits, safety signage, and ensuring compliance with local building codes.

General Maintenance & Functional Improvements:

Repairing shutters, gates, storage racks, ventilation systems, and improving overall usability of the warehouse.

How the Work Was Carried Out

Initial Assessment & Planning:

Conducted a detailed site inspection to identify all damages and prepared a comprehensive renovation plan, including material requirements and timelines.

Demolition & Removal:

Removed all broken, damaged, and unusable components to prepare the site for reconstruction.

Structural & Civil Works:

Executed concrete repairs, crack filling, reinforcement works, and restored the structural integrity of the building.

MEP Installation:

Installed new electrical, mechanical, and plumbing systems according to project specifications and safety standards.

Finishing & Upgradation:

Completed painting, flooring, ceiling installation, lighting setup, and all required finishing works to achieve a clean and functional environment.

Final Inspection & Handover:

Performed quality checks, safety inspections, and handed over the fully renovated warehouse to the client after ensuring all systems were operational.