I was involved in the structural renovation of a Saudi Post (SPL) building. The project focused on restoring and strengthening the existing structure to extend its service life and meet updated safety standards. My responsibilities included assessing the current structural condition, identifying areas of damage or weakness, and proposing suitable repair and reinforcement solutions. I prepared detailed renovation plans, conducted structural analysis, and coordinated with other engineering disciplines to ensure smooth execution. The renovation improved both the functionality and structural integrity of the building while preserving its original architectural character