his document presents a comprehensive and strategic action plan for the resumption of oil
production operations from a closed area, specifically focusing on the Tasour and Godah fields in
Block 32 Hawarim, after ten-year Shut-in period. The plan aims to guide the complex restart
process, emphasizing maximum operational efficiency, adherence to the highest standards of
environmental and industrial safety, and the realization of targeted economic returns. It is
grounded in an in-depth analysis of historical data, recent technical assessments of reservoir
dynamics, and a comprehensive economic feasibility study confirming the project's commercial
viability
The resumption of production from these fields represents a strategic opportunity to enhance
national oil production capacity and contribute to achieving state economic objectives.
Recognizing that restarting assets dormant for an extended period requires a deliberate approach,
this plan addresses anticipated challenges and ensures successful implementation. It provides a
practical and systematic framework for safe, efficient, and sustainable production resumption,
considering all technical, operational, economic, environmental, and security aspects.
This plan outlines key phases, detailed activities, required resources, key performance indicators,
and robust risk mitigation strategies. It is designed to serve as a reference for high authorities to
make informed strategic decisions and to guide technical and operational teams toward achieving
defined objectives safely and effectively, with an unwavering emphasis on transparency and
accountability throughout every step of implementation