BIM Electrical Coordination | Fire Alarm, Lighting, Power Systems, Cable Routing System
Proud to share a glimpse of my recent modeling work using Revit 2025, where I handled the full 3D coordination of the following systems for one of the project floors:
Fire Alarm
Lighting
Power
Cable routing
The model was developed to LOD 400 to accurately reflect real-world installation details, with a focus on precise cable routing, logical device connections, and spatial accuracy.
Tools & Workflow Highlights:
Accurate 3D cable routing between panels and devices
Section Boxes for effective clash visualization and system clarity
Integrated design across multiple electrical systems
Built for constructability and future maintenance
This kind of coordination bridges the gap between design and execution, reducing conflicts and improving site productivity.
(Screenshots from the actual Revit 3D model below)