تفاصيل العمل

Optimized assembly processes at Jade Textile’s Alexandria branch using Arena simulation modeling

and time studies. Improved efficiency by combining activities, reducing packaging batch sizes to 4 units,

and streamlining workflows. Achieved a 9.5% increase in Line 1 output 1335 units per cycle and an

11% boost in Line 7 productivity 1328 units per cycle, while reducing WIP and cycle times.

بطاقة العمل

اسم المستقل
عدد الإعجابات
0
عدد المشاهدات
46
تاريخ الإضافة
تاريخ الإنجاز