تفاصيل العمل

In this Project I construct overall the area of Power plant throughout the data from client Images videos and point cloud which i have been done present and future terms of model and there data included tha Bim Standard methodology periods as you can seen some of Images

بطاقة العمل

اسم المستقل معاوية خ.
عدد الإعجابات 1
عدد المشاهدات 23
تاريخ الإضافة
تاريخ الإنجاز