One floor residential house HVAC system design:
The project process was as the following :-
1) Manual J load calculations with ACCA manual J spreadsheet was done.
2)The house requires 2 tons refrigeration heat pump with 1000 cfm.
*Manual S spreadsheet was used to size the equipment and comply with ACCA standards
*Design is based on ACCA standards so reports can be used to get permit license from town/city
اسم المستقل | محمد ع. |
عدد الإعجابات | 0 |
عدد المشاهدات | 11 |
تاريخ الإضافة |