1000 tons refrigeration HVAC system design for a ten floors hotel building consists of basement, ground, mezzanine and seven typical floors.
The project process was as the following :-
1) load calculations with HAP software based on ASHRAE standards
2) Ducts and registers sizing was made based on ASHRAE standards
3) Chiller piping system and pipe sizes was made based on ASHRAE standards
4) Drawings and all design information are provided by AutoCAD MEP.
اسم المستقل | محمد ع. |
عدد الإعجابات | 0 |
عدد المشاهدات | 54 |
تاريخ الإضافة |