shop drawing Aire handling unit room
Job Description:
General
• Establishing preliminary / schematic design drawing with the coordination of discipline engineers.
• Establishing General Notes, Legends & Standard Detail drawings.
• Managing Plot files, Pen assignment, Titles & framing etc.
• Establishing Mechanical, Electrical, Plumbing & Architecture Coordination Plans.
• Establishing Complete SITE Utilities (Irrigation system, Fire Protection System, Drip system &
Chill water system.
• Establishing enlarged plan, isometric drawings, sections, elevations, schematics & riser diagrams.
• Managing CAD library for all the building services.
• Preparing of Bill of Quantity (BOQ) for all mechanical disciplines.
HVAC
• Helping out engineers for calculation of spaces areas expositors partitions of each condition zones.
• Allocation of mechanical equipment’s (Air Handling Unit, Fan Coil Unit, Chiller, Diffusers &
Grills etc.) with respect
To their sizes at suitable places and plant rooms.
• To draw HVAC Plans.
• Draw Air flow diagram, chilled water riser, fresh air riser, control diagram and exhaust air riser
diagram.
• Duct size by Duct Sizing Software & Ductsizer.
• Establishing HVAC Plant room (Primary & Secondary Chilled water system, Cooling water
system, Absorption System etc.)
اسم المستقل | Mohamed E. |
عدد الإعجابات | 0 |
عدد المشاهدات | 30 |
تاريخ الإضافة |