Work History
1.Advanced Network Company (ANC)-full time-{1/10/2008 28/2/2009}
1.1.Project manager assistance in project ITS Company “install 4500 point” “work 450 hours”
1.2.Project manager assistance in Theodor Bilharz Research Institute “install 2500 point””216 hours”
1.3.Project manager assistance in Ministry of Higher Education and Scientific Research “install 3000
point” “288 hours”.
1.4.Project Manager Assistance In The Ministry of Education and Technical Education
“install 5000 point “ “504 hours”.
2.“Department of Mechanics and Electricity” “Ministry of Water Resources and Irrigation” - full time -
{1/3/200930/9/2009}
2.1.Responsible for area 22 water well called Ganah (22 well ) “work 180 hours”
2.2.Responsible for area 30 water well called Gormashine (30 well) “work 252 Hours”
3.El wadi El gadid for Container (WGC) - full time - {1/10/2009till now}
3.1.Production engineer & Operator –junior – “7520 hours”
3.2.Production engineer & Operator –senior – “11000 hours”
3.3.Maintenance engineer –senior “2000 hours”
3.4.Production engineer & Operator –team leader –“10000 hours”
3.5.Production engineer & Operator– head department –“ 840 hours”
4.El hoda engineering for consult -junior–part time-{1/1/201330/6/2013}
4.1.Residential buildings in Paris Oasis “192 hours”
4.2.Residential buildings in El kharga oasis “384 hours”
5.Electrical contracting –part time-“1/7/2013 till now “
5.1.Execute electrical installation in apartment and store building “3000 hours”
6.Electrical programmer for control circuit –part time-“2015till now”
6.1.Programming and Execute zelio relay for 4 Blower with operation time 30 sec and leakage time 5 sec
“working 24 hours”
Experience
1.From working in ANC
1.1.. Design network (UTB), Or install design already.
1.2.Put time schedule for project execution with expect there are some consequence which may take
time to overcome it like decrees in resource
1.3.Cooperation with other company for saving time and money
1.4.Determine working teams, its number, Job should do.
1.5.Prepare sources and auxiliary tools relevance for tasks.
1.6.Monitoring and control the work according to time schedule money cost.
1.7.Monitoring store of resources.
1.8.Knowledge the places which can found on it some store for emergency condition or some helps if
need.
1.9.Documented and report the notes in project.
1.10.Testing work and delivery the project.
2.From Department of mechanics and electricity
2.1.Knowledge the number water well in my area, its places, How its work, hours operation, its act, its
component, maintenance schedule.
2.2.. Monitoring the act of pump, the operator, time of maintenance and the parts which damaged and
consumed.
2.3.. Knowledge the places which can need .
2.4.Document and report the note which need
3.From El wadi El gadid for container
3.1.As Operator
3.1.1.For Machine Krauss maffei 2009 “CV 3500/175 “ for production perform”PET” & For Machine
BaNenfield 2009 “HM 750/110” “injection molding machine”
3.1.2.Prepare the auxiliary machine to work and observe any change in operation of this machine
3.1.3.Make sure of product store there is space for store new product.
3.1.4.Make Sure of material store if there is enough purposes for production Process.
3.1.5.Make sure of the products and be ready to solve any product defects appear.
3.2.As Maintenance engineer
3.2.1.Monitoring and Document the life history of machine and operation data (temperature,
pressure, level, colure) of water, hydraulic and pneumatic circuit.
3.2.2.Monitoring the tools store and spare parts store.
3.2.3.Document the places which I’ll need like workshop, Diller of spare parts, the price of spare
parts and time take to bring from agency and from local market and other parts which can use
and give the job and configuration it.
3.2.4.Put Maintenance schedule and execute it to avoid damaged parts, lost money, lost time.
3.2.5.Update with the new technology used
3.3.As production engineer
3.3.1.Make sure of product Quality , the defect which appeared and the condition which appeared
on it
3.3.2.Monitoring and Document production data like “ cycle time ,pressure ,speed, temperature
and quality ,and calculate the waist time in order“
3.3.3.Monitoring and Document material which need in production ,and store to put new product
3.3.4.Monitoring and Document product in store
3.3.5.Put production schedule and execute it to achieve wanted target
3.3.6.Monitoring and Document the market competitors and development which achieved
3.3.7.Monitoring and Document market price of product and compare it with production cost and
how reduce the cost price.
3.3.8.Up-to-date with the new technology in production line and production machine.
3.3.9.Up-to-date with the price of new machine and used machine in global market
4.From El Hoda Engineering for consult
4.1.Updated with Egyptian code for electrical work
4.2.Updated with electrical component company and it’s product data ,Diller of this component
4.3.Updated with contractor of electrical work
5.From electrical contracting
5.1.Improving my skill in planning and updated my knowledge with the new installation technique
6.From programming
6.1.Improving my skill in different type of Plc like (zelio ,Ls ,Siemens ,Toshiba and logo)